Customization: | Available |
---|---|
Material: | NBR, FKM,Epdmect. |
Application: | Oil and Gas Industry |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
An O-ring is a toroidal sealing element with a circular cross-section, designed for precise mechanical sealing applications in both static and dynamic systems. Characterized by its simple geometry and robust functionality, this elastomeric component serves as a critical barrier against fluid/gas migration, ensuring system integrity under specified pressure differentials.
Rubber O-rings can be made from various materials depending on the operating environment:
Nitrile Rubber (NBR): Commonly used for oil-based seals, offering good oil, wear, and heat resistance but poor ozone and sunlight resistance. |
Silicone Rubber: Excellent high and low-temperature performance, suitable for food and medical industries, but has lower mechanical strength. |
FKM(Fluorocarbon Rubber): Offers excellent high-temperature and chemical resistance, commonly used in chemical and petroleum industries. |
EPDM (Ethylene Propylene Diene Monomer): Excellent weather, ozone, UV, and high/low-temperature resistance, commonly used in outdoor equipment and automotive cooling systems. |
Polyurethane (PU): Provides excellent wear resistance and high strength, often used in hydraulic system dynamic seals. |
PTFE (Polytetrafluoroethylene): Though not a rubber, it is commonly used where high temperature and chemical resistance are required. |
A : Standard parts:
Oil and gas industry: Hammer Union Seals, Pipe Wipers, Swivel Joints, U-Cups, O-Rings, Seals and Gaskets
Other industry: rubber door stopper, rubber chair leg caps, lab using rubber parts ect.PTFE backups, Peek parts ect.
B : Custom parts:
Exactly copy according to your design drawing or original samples.
SHQN can manufacture rubber products to meet any application you may require.
Port: | Shanghai |
MOQ: | 5000 pcs,Custom parts: 10000pcs |
Packing: | bulk packing or custom packing |
Payment: | PayPal, T/T, Western Union, L/C |
Delivery time: | 7-15days,depend on the quantity |
Product | Picture | Detail |
Hammer union seal |
![]() |
1" 1502, Buna / FKM/ HSN 1-1/2" 1502, Buna / FKM/ HSN 2" 602/1502, Buna / FKM/ HSN(Brass/Stainless Anti-Ext) 3" 602/1502, Buna / FKM/ HSN(Brass/Stainless Anti-Ext) 4" 602/1002/1502, Buna / FKM/ HSN(Brass/Stainless Anti-Ext) 2" FIG 206, Buna / FKM/ HSN 3" FIG 206, Buna / FKM/ HSN 4" FIG 206, Buna / FKM/ HSN |
Swivel joint kits |
![]() |
2" Normal Swivel Kit 2" SMI-Oversized Swivel Joint Kit 3" SPM Swivel Kit 3" Swivel Kit 3" Wide Swivel Kit 4 inch 10k 1002 FET/Flowvalve Kit 4" 15k Kemper Swivel Kit 4" 15k Forum Swivel Kit 4" 15k FlowValve Swivel Kit 4" 15k Swivel Kit |
Repair kits |
![]() |
#10 setting tool #10 Baker Firing Head Kit #20 setting tool #20 Firing Head Kit DWS 3 5/8 COMPACT #20 BP3.SEC kits Grease Tubes Seal Kit #10 BP3.SEC kits 3 1/2" Shorty Kits T-BRT redress kit 3 - 1/8" Weight Bar Kit T-1 Set GC Stripper Head Redress Kit |
Plug valve seal Kits | ![]() |
1" Low Torque Plug Valve Seal Kit 2"x1" Low Torque Plug Valve Seal Kit 2"x2" Low Torque Plug Valve Seal Kit 3" Low Torque Plug Valve Seal Kit 4" Low Torque Plug Valve Seal Kit |
Q: What is the shipping time of samples?
A: Usually 3-5 Day.
Q: Can I custom product and print my logo on the product or packaging?
A: Yes, we offer customization services. For details, please contact us.
Q: Can you manage the shipment of products?
A: Absolutely, we can arrange different shipping methods based on the final packaging of the goods, including
express, air, or sea shipping.
Q: Can you send the goods to an Amazon warehouse?
A: Certainly, just provide us with the exact address, and we will arrange the shipment accordingly.
Q: What payment methods do you accept?
A: We accept PayPal, Western Union, TT (bank transfer), credit card, and so on.
Q: What is the lead time?
A: For stock goods, the lead time is generally within 15 days, depending on the quantity. For custom orders, production takes approximately 12-15 days, depending on the packaging and quantity.